Roger & Jan's House

 
 
 
 
29/11/2004 the old building
29/11/2004 master bedroom
29/11/2004 interior
29/11/2004  rear of bunker
25/4/2005 START lowering cesspool section
  25/4/2005  first part of cesspool
  26/4/2005  2nd part cesspool + lid
26/4/2005 extension shuttering being built
26/4/2005  steel for foundation being laid
28/4/2005 extension concrete foundation
28/4/2005 column steelwork
5/5/2005 extension scaffolding being errected
6/5/2005 scaffold for extension roof
  6/5/2005   roof shuttering from inside
10/5/2005 extension roof metalwork
12/5/2005 overhead electrics in concrete
17/5/2005 column shuttering
24/5/2005 starting brickwork on extension
24/5/2005 cavity insulation
24/5/2005 footings trench for patio
 26/5/2005 patio foundations
 26/5/2005 front windows cut in
28/5/2005 interior walls
28/5/2005 knocking arch through to dining-sitting area
28/5/2005 extension brickwork
 1/6/2005  boiler room foundations
  1/6/2005  patio foundation
1/6/2005 through to dining-sitting area
  2/6/2005  patio base concreted
4/6/2005 windows & brickwork in old bunker
   6/6/2005    old roof off & boiler room built
8/6/2005 exterior cement coating on
 11/6/2005  roof timbers started
12/6/2005 close boarding on
13/6/2005 insulation on
13/6/2005 insulation & gully on
 15/6/2005  roof and marble sills
 18/6/2005 floor drains
1/7/2005 internal plastering
3/7/2005 external plastering on back
 3/7/2005  using plaster gun
3/7/2005 smooth plaster finish on back
4/7/2005 smooth plaster on front
6/7/2005 concrete cut for c. heating pipes
8/7/2005 concrete smoothing dining-sitting area
  9/7/2005  patio tiling
9/7/2005 kitchen floor tiling
12/7/2005 internal & external tiles grouted
 11/7/2005  bath installed
 13/7/2005  bath tiles on
13/7/2005 plasterboard ceiling framework
 16/7/2005 front door & shutters on
16/7/2005 bathroom loo, basin, & taps installed
19/9/2005 shower room
 20/7/2005 front door handle fitted
20/7/2005 shutters on, pergola erected
20/7/2005 installing air con on roof of boiler house
   20/7/2005   air con units installed
20/7/2005 pergola tiled
  20/7/2005   loft access fitted
20/7/2005 interior painting completed
 22/7/2005 door painting commences
26/7/2005 kitchen unit installation starts
  2/8/2005  door furniture fitted
3/8/2005 bedroom cupboards installed
3/8/2005 kitchen installed
3/8/2005 bedroom cupboard & drawers
3/8/2005 radiators installed
17/8/2005 white goods installed
17/8/2005 kitchen lighting finished, project completed
17/8/2005 master bedroom NOW
17/8/2005 sitting area
17/8/2005 sitting area
19/9/2005 dining sitting area
19/9/2005
office area
19/9/2005
drive graveled
19/9/2005
mini terrace
facing sea
19/9/2005
terrace
facing sea
19/9/2005
view from
mini terrace to sea
19/9/2005
hedge trimmed